When receiving applications, the certification body shall visit the applicants' factories and verify their manufacturing and facilities and systems in accordance with CENELEC CCA-201 or CGI 024 procedure (Form MC6/B & C or CGI 023) prior to granting certification. Factory inspection will be performed by the certification body where is related with the certification body under MOU.
If an earlier factory inspection of a model of the same type of product manufactured in the same factory was conducted, it can be accepted results from the earlier factory inspection.
|